
Group E · New build, extension and structural wall systems
Thermal-bridge-free detailing, airtightness and MVHR for very low energy homes.
Priced after survey
Passivhaus and low-energy build
Every job like this is different, so we measure first and give you a fixed written quote. The price depends on:
No obligation — your survey confirms what suits and what it costs.
What it is
Thermal-bridge-free detailing, airtightness and MVHR for very low energy homes.
Best for: Premium new builds.
Who it suits
Pick your property type for a straight answer on passivhaus and low-energy build.
Guidance only — every home is different, and a survey confirms what suits yours.
Houses
Flats and blocks of flats
Commercial and public buildings
Usually suitable Depends — a survey confirms
Materials and brands
Thermal-bridge-free detailing, airtightness and MVHR for very low energy homes.
Heat, bills and EPC
In a new build the walls, roof and floor are designed together to meet Building Regulations Part L, and the SAP calculation shows the result before you build. Better airtightness and fewer thermal bridges mean lower running costs from day one, and a strong EPC on completion.
See the EPC points and savings for your home in the EPC plannerU-value before and after, typical heat and bill saving, and EPC points — worked out for your property.Price
Priced after survey
Jobs like this vary too much for a fair online price, so we measure first and give you a fixed written quote — with no obligation.VAT on this work
Insulation installed in homes in Great Britain is zero-rated for VAT until 31 March 2027. Other parts of a job like this — such as a new roof covering, structural work or waterproofing — may be standard-rated. Your quote shows the split.What to expect
Set by the build programme — agreed with you and your designer.
Part of a new build or extension project rather than work in an occupied home.
Planning and building control for the project, design-stage SAP calculations, and the system's certificate (with warranty provider acceptance where relevant).
PHPP modelling, air test. The guarantee and certification for your job are confirmed in writing in your quote.
Questions
A design standard for very low energy buildings, using high levels of insulation, airtightness, thermal-bridge-free detailing and heat recovery ventilation.
The design is modelled in PHPP, and airtightness is tested on site.
Yes — we work with your designer and certifier to deliver the insulation, airtightness and MVHR details.
Group E

Interlocking EPS blocks filled with concrete on site — structure and insulation in one.

Factory-made insulated panels for walls and roofs.

Closed-panel timber frame with mineral wool or wood-fibre and an airtight membrane.

Full-fill mineral wool batts or partial-fill PIR in new masonry cavities.

Aircrete or insulated blocks for the inner leaf.
Begin your project
Tell us about your home and we'll arrange a survey, then a fixed written quote — no obligation.