
Who we help · Commercial and public buildings
Usual measures: Floors over commercial units, EWI, roofs, acoustic insulation. Watch-out: Separate residential and commercial requirements.
Priced after survey
Heat loss survey: commercial building
From £750
Room-by-room or zone heat loss for heating and HVAC design.
Send a commercial enquiryCredited against your works if you go ahead.
Read the full guide: Commercial
Open the guideAt a glance
Measured after survey
Commercial buildings are measured and priced per m² after a survey, and works are planned around how the building runs.Recommended

Insulating floors over unheated garages, passages, undercrofts and overhangs.

A complete certified build-up of insulation board, mesh and render from one system holder.

Warm-deck and tapered insulation with new waterproofing.

Sound insulation in floors, party walls and ceilings.
Funding and VAT
0% VAT on energy-saving materials applies to homes, so commercial work is normally standard-rated. We'll set out any funding that may apply after the survey.Commercial and public buildings
Begin your project
Tell us about the building and we'll arrange the right survey, then a priced, phased proposal.