Two residential tower blocks above trees

Blocks of flats

Blocks of flats — how we take on a whole-building project.

For freeholders, residents' management and right-to-manage companies, managing agents, housing associations and councils. One survey, one specification, one programme — with the fire safety rules for your building's height, and the leaseholder consultation, built in from day one.

Where every block starts

Block of flats energy and fabric survey

From £1,500 per block

  • Building survey of walls, roof, windows and balconies
  • EPC sample across representative flats
  • Heat-loss and condensation risk analysis for each build-up
  • Structure and wall-tie check
  • Fire risk appraisal of external walls (PAS 9980) where relevant
Start a block enquiry

Options report for freeholders and leaseholders included.

Who we work with

Built for the people who run buildings

Freeholders

Building owners planning works across the whole block, with costed options for leaseholders.

Residents' management companies

RMC directors who need clear options, a resident pack and a contractor who explains the process.

Right-to-manage companies

RTM companies taking on major works for the first time, with the consultation steps set out.

Managing agents

Agents running Section 20 consultations who need a survey, specification and priced options.

Housing associations

Programmes across stock, including Warm Homes: Social Housing Fund bids.

Councils

Whole-block retrofit of council stock, often alongside window and heating replacement.

Fire safety

Your building's height decides the rules

We specify every block to its height band and the fire risk appraisal — and fit cavity barriers and fire-stopping on every job.

18 m and over (or 7+ storeys)

High-rise block

Combustible materials are banned in external walls, so only non-combustible insulation (mineral wool) and finishes are used.

Usual measures
Non-combustible insulation only, roof, windows, communal heating
Watch-outs
Combustible materials banned in external walls; Building Safety Regulator approval for works
High-rise block in detail

11–18 m

Mid-rise block

Specified to Approved Document B and the fire risk appraisal of the external walls.

Usual measures
Non-combustible EWI (mineral wool), roof, windows
Watch-outs
Fire risk appraisal of external walls (PAS 9980)
Mid-rise block in detail

Under 11 m

Low-rise block

Specified to Approved Document B, with the insulation chosen for the building and its use.

Usual measures
Whole-block EWI, flat roof, cavity, windows, communal heating
Watch-outs
Section 20 consultation for leaseholders
Low-rise block in detail

Cavity barriers and fire-stopping on every job, whatever the height.

The survey

What we look at first

  • Building survey of walls, roof, windows and balconies
  • EPC sample across representative flats
  • Heat-loss and condensation risk analysis for each build-up
  • Structure and wall-tie check
  • Fire risk appraisal of external walls (PAS 9980) where relevant

Approvals

Who signs it off

Building control

Every whole-block insulation project goes through building control.

Building Safety Regulator

For higher-risk buildings (18 m and over, or 7+ storeys), building control approval comes from the Building Safety Regulator.

Planning

Needed where the appearance changes — flats have no permitted development rights for EWI.

Leaseholders

Consultation, done properly

  • Section 20 consultation where any leaseholder will pay more than £250 towards the works
  • Costed options, so leaseholders can see what each choice means for them
  • Resident information packs explaining the works, the programme and what to expect

Delivery

Residents stay in, the building stays running

  • Scaffolding planned around access, parking and refuse
  • Residents stay in their homes throughout
  • Phased elevations, so each side of the building is finished in turn
  • Communal roof, windows and heating in one programme

Prices

How blocks are priced

Blocks are priced per m² of wall or per flat after the block survey. Indicative ranges, including VAT, before any funding.

Render isn't insulation

Re-rendering a block renews its finish but doesn't improve its EPC. We show insulated and render-only options side by side in the options report.
Blocks of flats price ranges
MeasureTypical range
External wall insulation + renderWhole-block EWI, per m² of wall£130–£220 per m²block
EWI with brick slip finishPer m² of wall£170–£280 per m²
Re-render only (K Rend silicone)Not insulation — per m² of wall£55–£95 per m²
Cavity wall insulation£600–£1,200 per flatper flat
Cavity extraction and refillBlock survey
Block of flats energy and fabric surveyCredited against the works if you go aheadFrom £1,500 per block

Indicative ranges for London and the South East, supplied and installed, including VAT. Updated 11 October 2026. A survey confirms your final price.

Funding

Ways whole-block works can be funded

Eligibility depends on the building, its owner and its residents — we set out what may apply in the options report.
  • Warm Homes: Social Housing Fund

    Landlord-led bids for social landlords and housing associations with EPC D–G stock.

  • Can fund insulation for eligible low-income and vulnerable households, depending on eligibility. Installs must be complete before the scheme closes.

  • Local and regional schemes

    Council schemes vary by borough and region — checked by postcode.

  • Private rented flats must reach EPC C by October 2030 — building-wide works can form part of each landlord's plan.

Block enquiry

Tell us about the building

A few details are enough to start: who you are, the building's height and number of flats, and what you're considering. We'll call to talk through the survey and the consultation steps.

A leaseholder in a single flat? See insulation for flats for what you can do inside your own home.

What are you considering? Tick any

Questions

Blocks of flats, answered

Can a block of flats have external wall insulation?

Yes, as a whole-building project. On blocks 18 m and over only non-combustible insulation and finishes are allowed, 11–18 m blocks follow Approved Document B and a fire risk appraisal, and planning is needed where the appearance changes.

Do leaseholders have to be consulted?

Where any leaseholder will pay more than £250 towards the works, the landlord must carry out Section 20 consultation. We provide costed options and resident information packs to support it.

Do residents need to move out during the works?

No. Residents stay in while scaffolding goes up and elevations are completed in phases.

What does a block survey cost?

Our block of flats energy and fabric survey starts from £1,500 per block: a whole-block survey, sample EPCs and an options report for freeholders and leaseholders.

How are whole-block works funded?

Depending on the building and residents, funding may come from the Warm Homes: Social Housing Fund for social landlords, ECO4 for eligible households while it's open, council schemes, or landlord EPC C plans.

Begin your project

Start with a block survey

A whole-block survey, sample EPCs and an options report for freeholders and leaseholders — credited against the works if you go ahead.

CallWhatsAppGet a quote