
Group G · Airtightness, thermal bridging and finishing
Cavity barriers and fire-stopping installed with EWI, cavity and loft works.
Priced after survey
Fire-stopping and cavity barriers
Every job like this is different, so we measure first and give you a fixed written quote. The price depends on:
No obligation — your survey confirms what suits and what it costs.
What it is
Cavity barriers and fire-stopping installed with EWI, cavity and loft works.
Best for: All EWI and blocks of flats.
Who it suits
Pick your property type for a straight answer on fire-stopping and cavity barriers.
Guidance only — every home is different, and a survey confirms what suits yours.
Houses
Flats and blocks of flats
Commercial and public buildings
Usually suitable Depends — a survey confirms
Materials and brands
Cavity barriers and fire-stopping installed with EWI, cavity and loft works.
Insulation brands we work with
The exact system and brand for your home are confirmed in your written quote.
Heat, bills and EPC
Draughts carry warm air straight out of a home, and thermal bridges create cold spots where heat bypasses the insulation. Sealing and fixing them reduces heat loss and makes rooms feel warmer, while controlled ventilation keeps the air healthy and the fabric dry.
See the EPC points and savings for your home in the EPC plannerU-value before and after, typical heat and bill saving, and EPC points — worked out for your property.Price
Priced after survey
Jobs like this vary too much for a fair online price, so we measure first and give you a fixed written quote — with no obligation.VAT on this work
Insulation installed in homes in Great Britain is zero-rated for VAT until 31 March 2027. Other parts of a job like this — such as a new roof covering, structural work or waterproofing — may be standard-rated. Your quote shows the split.What to expect
Draught-proofing is usually done in a day. Airtightness, thermal bridging and ventilation work is scheduled with the main retrofit.
Low for draught-proofing; higher where floors, linings or ceilings are opened up.
Ventilation must meet Building Regulations Part F, fire-stopping follows Approved Document B, and funded whole-house retrofit follows PAS 2035.
Approved Document B. The guarantee and certification for your job are confirmed in writing in your quote.
60-second grant check
Grant eligibility checker
About 60 seconds · plain results: likely, possibly or not eligible
Before we start
Questions
Fire-resistant barriers placed in cavities and at junctions to stop fire and smoke spreading through hidden voids.
With EWI, cavity and loft works, and on every block of flats project, to Approved Document B.
Yes — on EWI jobs, fire breaks at party walls and openings are part of the detailing wherever the system requires them.
Group G

Insulated lintels, reveal and cill insulation and thermal breaks that stop cold spots and mould.

Membranes, tapes, grommets and sealants at joints, service holes and floors.

Sealing doors, windows, letterboxes, hatches, floorboards and unused chimneys — every home's quick win.

Pipe lagging, cylinder jackets, radiator reflector panels and loft tank insulation.

Sound insulation in floors, party walls and ceilings.

Trickle vents, extract fans, PIV or MVHR so a better-sealed home stays dry.
Begin your project
Tell us about your home and we'll arrange a survey, then a fixed written quote — no obligation.